A-Level Business/Year 12 · 3.2.1 People management/Organisational design
Topic page · AS Paper 2 · A-level Paper 2

Organisational design

How a business arranges its managers decides who makes decisions, how fast information moves and how much it costs. This page covers span of control, tall and flat structures, centralisation and delayering.

Is a flat structure always better than a tall one, and how do I argue that in 9 or 15 marks?

Spec pointAQA 3.2.1
YearYear 12 (AS and A-level)
PapersAS Paper 2 · A-level Paper 2
ModelNone
Typical marks2 to 15
Where this sits on your specification
AQA AS Business 7137
3.2.1
People management · Year 12
AQA A-level Business 7138
3.2.1
People management · Paper 2
Outgoing A-level 7132 (exams June 2027)
Partly in 7132 section 3.6
Partly in 7132 section 3.6 (Decision making to improve human resource performance); structure is not named in that section heading, so check your own course notes.
Short answer

Organisational design is how a business arranges authority and communication. Span of control is how many staff report to one manager. Levels of hierarchy are the layers of authority. Tall structures have many layers and narrow spans. Flat ones have few layers and wide spans. Centralised firms decide at the top. Decentralised firms delegate. Delayering removes layers.

Year 12 or Year 13?

Year 12 (7137/7138): This is AS content (AS is the first-year qualification) in 3.2.1 People management. It is examined on Paper 2 at AS in 2027 and on A-level Paper 2 in 2028. Learn the definitions first, because AS has 2-mark and 4-mark questions. Then practise two-sided arguments for the 9-mark and 15-mark questions.

Year 13 (7132, June 2027): Your course covers this topic only partly, mainly within section 3.6. The ideas are the same, so use this page as revision. Pay most attention to the judgement step, because structure questions often ask whether delayering or centralisation suits a particular business. Your papers follow the 7132 format, not the 7138 one.

Section IWhat the specification asks and the core ideasSpan, levels, tall and flat structures, centralisation, and what each does to speed and cost.

The specification (3.2.1 People management) asks you to know four things. They are span of control and levels of hierarchy, tall versus flat structures, centralisation versus decentralisation, and restructuring through delayering and centralisation. For each you must give advantages and disadvantages. None of the sophisticated concepts listed in Annex 8 is needed here. Links to Hackman and Herzberg can earn credit if you use them accurately.

Span of control and levels of hierarchy

The span of control is the number of subordinates who report directly to one manager. The levels of hierarchy are the layers of authority from the top of the business to the front line. The chain of command is the line along which orders pass down and information passes up.

Span and levels move in opposite directions for a fixed workforce. A wider span needs fewer managers, so there are fewer levels. A narrower span needs more managers, so there are more levels.

Tall versus flat

A tall structure has many levels and narrow spans. A flat structure has few levels and wide spans. Tall structures give close supervision and clear promotion steps. They also slow communication because messages pass through many people, and they cost more in management salaries.

Flat structures cut cost and speed up decisions. They also give staff more freedom, which can raise motivation. But managers with wide spans have less time for each person, so support and control can weaken.

Centralisation versus decentralisation

In a centralised business, senior managers keep most decision-making power. This gives consistency and tight control. It suits businesses where a mistake is costly or the brand must look the same everywhere.

In a decentralised business, authority is delegated (passed down) to lower levels or local units. Decisions are faster and closer to customers. Staff may feel more trusted. The risk is inconsistency and decisions that do not fit the overall strategy.

Restructuring

Delayering means removing one or more levels of hierarchy, usually in middle management. It widens spans, cuts salary costs and shortens the chain of command. The costs are redundancy payments, lost experience, overloaded managers and worried staff.

A business can also restructure by centralising, which pulls decisions back to head office. This can cut duplication and give control after a crisis. It can also frustrate local managers who lose power.

Worked example

Illustrative figures: a business has 256 front-line staff. With a span of 4, it needs 64 supervisors, then 16, then 4, then 1 director. That is 85 managers and 5 levels. With a span of 8, it needs 32 supervisors, then 4 managers reporting to 1 director. That is 37 managers and 4 levels.

The wider span removes 48 managers. If each costs £45,000 a year, the saving is £2,160,000. This is 48 × £45,000. A good answer then asks whether 8 staff per supervisor is workable for this business.

Section IIHow it works in a real businessReal delayering at Citigroup and Amazon, and what the diagram shows.

Large firms restructure when they feel slow. Bloomberg reported in October 2023 that Citigroup, the US bank, planned to remove five management layers.[1] Amazon, the online retailer, set out a plan to raise the ratio of individual contributors to managers, according to Fortune in November 2024.[3]

Both cases show the same logic. Fewer layers should mean faster decisions and lower cost. They also show that delayering is a choice about span of control. If a manager supervises more people, there are fewer managers.

Look at the figure. Both panels have the same 8 staff at the bottom. The tall panel needs 4 levels because each manager has 2 reports. The flat panel needs 3 levels because each manager has 4. The flat firm needs 3 managers in total and the tall one needs 7, so its salary bill is lower.

Now apply it to a case study. Ask how many staff each manager supervises, how many layers a decision passes through, and how much the business needs consistency. Then link each point to the firm. A fast-growing start-up and a food factory with strict safety rules will not need the same structure.

Tall structureFlat structureCEO4 levels, span of control 28 staff at the bottom, 7 managersCEO3 levels, managers' span of control 48 staff at the bottom, 3 managers
Figure 1. The same 8 staff in a tall and a flat structure. The wider span of control in the flat panel removes one level and four managers.
Section IIIEvaluation: what it depends onJudgements turn on the type of work, staff skills, costs of change and time.

Evaluation means weighing arguments and reaching a judgement. For organisational design, the judgement depends on a small set of factors.

  • Type of work. Routine or risky tasks suit narrow spans and central control. Creative or local work suits wider spans and delegation.
  • Skill and experience of staff. Skilled, motivated staff can cope with wide spans, so a flat structure works. New or unskilled staff need more supervision.
  • Size and growth. A small business can be flat by default. A large one that stays flat may overload managers.
  • Cost against disruption. Delayering saves salaries over time. But redundancy costs, lost knowledge and falling morale arrive first, so the payback may take years.
  • Time frame. Short-term cost cuts can hurt long-term service if experienced managers leave.
  • Strategy. A business aiming for a uniform brand may centralise. One entering varied markets may decentralise.

A strong conclusion names the factor that matters most for this firm and says why. For example: delayering is likely to work here because the staff are experienced and the tasks are not risky, so wider spans will not cut quality.

Also remember that flattening does not always work as intended. A Fortune profile of Citigroup's CEO, republished by Yahoo Finance in 2026, carries that warning in its headline.[2] Saying so shows careful judgement.

Section IVThe mistakes that lose marksTreating flat as always good, confusing span with levels, and listing without context.

Most lost marks come from four habits. Each one is easy to fix.

Mistakes to avoid

  • Saying flat is always better. A flat structure overloads managers if staff are inexperienced. Always say when it works and when it does not.
  • Mixing up span and levels. Span is the number of people reporting to one manager. Levels are the layers in the whole business. They are linked but not the same.
  • Confusing delayering with redundancy in general. Delayering removes a layer of management. Cutting front-line staff is a different decision.
  • Listing advantages with no context. A point such as faster communication earns little. Say what it means for this business, then why it matters, so it earns AO2 and AO3 marks.
Key termsKeywords to use preciselyThe terms examiners expect you to define and use correctly on this topic.
Span of controlThe number of subordinates who report directly to one manager.
Levels of hierarchyThe layers of authority between the top of a business and the front-line staff.
Tall structureAn organisation with many levels of hierarchy and narrow spans of control.
Flat structureAn organisation with few levels of hierarchy and wide spans of control.
CentralisationKeeping decision-making power with senior managers at the top or at head office.
DecentralisationPassing decision-making power down to lower levels or local units.
DelegationPassing authority for a task or decision to a subordinate, who remains accountable to the manager.
DelayeringRemoving one or more levels of hierarchy, usually in middle management.
How it is examinedSix question archetypesDefine, Explain, Analyse, Assess, Evaluate and quantitative questions, with the AOs each one rewards.

Every AQA Business question uses one of five command words, each with a fixed mark tariff, and quantitative questions sit inside the 9 and 15-mark formats. The A-level papers have no 2 or 4-mark questions. Open each format to see how this topic appears in it. All questions here are original Curriculum Circle practice questions, not board questions.

ARCHETYPE 01Define2 marks · AS onlyAO1

On this topicAS only. Asks for a precise definition of one structural term, such as span of control or delayering. No context is needed.

What earns the marksAO1 only: two marks for a clear definition, or one mark for a partial one.

CC practice questionDefine 'span of control'. (2 marks, AS only)

ARCHETYPE 02Explain4 marks · AS onlyAO1 · AO2

On this topicAS only. Asks you to give a point and link it to a stated business, such as why a wide span suits a team of experienced staff.

What earns the marksAO1 for the idea and AO2 for applying it to the named context.

CC practice questionExplain one reason why a bakery chain with 300 shops might choose a wide span of control for its area managers. (4 marks, AS only)

ARCHETYPE 03Analyse6 marksAO1–AO3

On this topicAsks for a developed chain of reasoning, such as how delayering cuts costs and speeds decisions in the case.

What earns the marksAO1 for the term, AO2 for context and AO3 for a chain of cause and effect.

CC practice questionAnalyse how delayering might affect communication at a regional bus company with five levels of management. (6 marks)

ARCHETYPE 04Assess9 marksAO1–AO4

On this topicAsks for arguments for and against, then a judgement, such as whether a flat structure suits the business.

What earns the marksAO1 to AO3 for the arguments and AO4 for a supported judgement.

CC practice questionAssess whether a flat organisational structure is suitable for a fast-growing online fashion retailer. (9 marks)

ARCHETYPE 05Evaluate15 marksAO1–AO4

On this topicAsks you to weigh two options, such as delayering against centralising head-office decisions, and recommend one with reasons.

What earns the marksAO1 to AO3 for developed arguments on both options and AO4 for a justified recommendation.

CC practice questionEvaluate whether a supermarket group should delayer its management or centralise buying decisions to cut costs. (15 marks)

ARCHETYPE 06Quantitative9 or 15 marksAO1–AO4

On this topicUses staff numbers and salaries from the case to find how many managers a change in span removes, and the saving. The figures then support a judgement on whether it is worth it.

What earns the marksAO1 and AO3 for accurate calculation and use of figures, and AO4 for judging what the numbers mean.

CC practice questionIllustrative figures: a firm has 360 front-line staff and a span of 6. It plans a span of 9. Each manager costs £50,000 a year. Assess whether the change is worthwhile. (9 marks)

Assessment objectivesWhat the examiner is testingAO1 to AO4, their weightings, and what each one means on this topic.
 WeightWhat it isWhat it means on organisational design
AO132.5% AS · 24.44% A-levelKnowledge and understanding of terms, concepts, theories, methods and modelsKnow the four terms exactly: span, levels, centralisation and delayering. Know the standard advantages and disadvantages of tall and flat structures.
AO227.5% AS · 24.44% A-levelApplication to the business context in the case studyName the business, its staff, its work and its size. A point about a food factory differs from a point about a creative agency.
AO320% AS · 26.66% A-levelAnalysis of issues and their impact on individuals and organisationsBuild chains with because and so. For example: wider span, so fewer managers, so lower wage costs, so higher profit.
AO420% AS · 24.44% A-levelEvaluation of quantitative and qualitative information to make judgementsWeigh the trade-offs and judge. Say which factor matters most, such as staff skill or the risk of the work, and what you would need to know.

Weightings are approximate and taken from the AQA AS 7137 and A-level 7138 specification [0].

Exam applicationA model chain of reasoningAnalysis, then evaluation, on an original practice question.

Evaluate whether a UK retail chain with six levels of management should delayer or keep its current tall structure. (15 marks)

Analysis

Delayering would remove one or two levels of middle managers, so the chain has fewer salaries to pay. This lowers costs and raises profit, which matters because the retail margin is thin. Fewer levels also shorten the chain of command, so store feedback reaches head office faster. The firm can then change prices or stock before sales are lost.

Evaluation

Delayering is a risk if store managers are new. Wider spans give less coaching, so mistakes may rise and customer service may fall. Redundancy payments also arrive first, so the saving may take years. I recommend delayering one level only, because store teams are experienced and the main weakness is slow decisions. This also limits the loss of knowledge. The judgement would change if staff turnover were already high.

Why this works

The chain moves from structure to cost to profit, and the judgement names the condition that would change it.
Real worldWhere you have already seen thisCurrent, dated examples you can use for AO2, each with its source.
01

Bloomberg reported in October 2023 that Citigroup's chief executive planned to remove five management layers in a reorganisation.[1] A Fortune profile republished by Yahoo Finance in 2026 said she had cut management layers from 13 to 8, but warned that the 'great flattening' does not always work as intended.[2]

02

Fortune reported in November 2024 that Amazon chief executive Andy Jassy was planning to increase the ratio of employees to managers, because he dislikes bureaucracy.[3] The aim of a higher ratio is a wider span of control, so fewer managers per employee.[3]

03

Entrepreneur reported in 2025 that Jassy said he wanted fewer middle managers, and that the way to get ahead at Amazon was not to oversee a giant team.[4] CNBC reported in November 2025 on the upheaval at Amazon after mass layoffs, so a flatter structure and job cuts can arrive in the same period.[5]

Going deeperThe five branchesFive planned pieces, each built to train one assessment objective.

Everything above is the topic page. The pieces below take it further. Each one trains a particular assessment objective rather than covering the topic again, and they are added over the year.

Trains AO2
Branch 01 · The Case
The Case: Citigroup cuts five layers
A step-by-step look at why a large bank cut its hierarchy from 13 layers to 8 and what the evidence does and does not show.
Planned · Jan 2027
Trains AO1 · AO3
Branch 02 · The Model
The Model: span, levels and the cost of managers
A worked method for calculating how many managers a change in span of control removes, then judging whether the saving is worth the risk.
Planned · Feb 2027
Trains AO1 · AO3
Branch 03 · The Misconception
The Misconception: flat is always better
Why this belief costs marks, and how to show the conditions under which a tall structure is the better choice.
Planned · Mar 2027
Trains AO4
Branch 04 · The Examiner's Line
The Examiner's Line: what would change my judgement
The sentence that turns a list of delayering pros and cons into a conclusion tied to staff skill, risk and time.
Planned · Apr 2027
Trains AO1–AO4
Branch 05 · The Question
The Question: delayer or centralise?
One 15-mark question answered at two grades, with the difference in analysis and judgement marked up side by side.
Planned · May 2027
ReferencesSourcesEvery figure and fact on this page, with links.
Nearby

Related topics

Where the depth lives

The CC Business revision platform has timed practice questions on this topic, and the Inner Academy's recorded lessons walk through full 9-mark and 15-mark answers.

See the Business platformThe Inner Academy